Designed with the customer’s equipment in mind and configured to carefully manage and control each test parameter, these systems meet all required operational and safety requirements.
All equipment undergoes a full factory acceptance test before being delivered to the customer.
Denatec carries out the positioning, implantation and installation of the equipment before performing a rigorous on-site acceptance test (SAT).
Once the client has given their approval, Denatec provides formal training on the correct and safe operation of the equipment, then issues the final technical documentation and certification upon completion of the training. Written exam programs can also be provided upon request.